NEW OFFER SUGAR – MAY - 2009 Icumsa 45, 100, 150, 800,1.200. Origen: Brazil QUANTITY : 150.000 MT - 12.500 MT X 12 : USD 310,00 300.000 MT - 25.000 MT X 12 : USD 295,00 450.000 MT - 37.500 MT X 12 : USD 280,00 600.000 MT - 50.000 MT X 12 : USD 260,00 1.000.000 MT : USD 220,00 2.000.000 MT : USD 200,00 3.000.000 MT : USD 195,00 5.000.000 MT : USD 185,00 10.000.000 MT: USD 175,00 Payment: SBLC or BG total contract, Unconditional, Transferable or non Transferable, Divisible, Irrevocable. Contract Minimiun 12 months and quantity maximiun month of 100.000 MT. CIF ASWP – First Shipment in 45/60 days QUANTITY 20% IN BG/SBLC 30% IN BG/SBLC 50% IN BG/SBLC 600.000 MT - USD 290,00 1.000.000 MT - USD 285,00 USD 270,00 2.000.000 MT - USD 275,00 USD 265,00 USD 215,00 3.000.000 MT - USD 255,00 USD 210,00 USD 200,00 5.000.000 MT - USD 210,00 USD 195,00 USD 190,00 Contract Minimiun 12 months – Quantity maximiun month of 100.000 MT. Payment : BG or SBLC Unconditional, Transferable or non Transferable, Irrevocable, Divisible and DLC. CIF ASWP - First Shipment in 45/60 days Procedures: 1) Buyer issues a LOI + RWA + NCND 2) Seller issues FCO 3) Buyer sign, seal and return the FCO 4) Seller issues Draft Contract 5) Buyer sign, seal and return the Contract, seller sign the Contract and return to the Buyer 6) Buyer and Seller deposit a copy of the executed Contract to their respective Banks. 7) Within 3 (three) banking days, Buyer Bank sends a Non-operative FFSBLC or BG for total shipment value to the seller’s Bank 8) Within 48 hours Seller's Bank sends Proof of Products (POP) + PB 2% via Swift Bank to Bank methods to the Buyer’s Bank 9) FFSBLC or BG operative. 10) Shipment. ORIGIN: BRAZIL – ICUMSA 45 12.500 MT 395,00 SPOT TDLC 25.000 MT 380,00 SPOT TDLC 50.000 MT 345.00 SPOT TRARDLC 100.000 MT 340.00 SPOT TRARDLC 150.000 MT 330.00 12.500 MT X 12 TRARDLC 300.000 MT 320.00 25.000 MT X 12 TRARDLC 600.000 MT 300.00 50.000 MT X 12 TRARDLC 900.000 MT 290.00 75.000 MT X 12 TRARDLC 1.200.000 MT 285.00 100.000 MT X 12 TRARDLC 2.400.000 MT 270.00 200.000 MT X 12 TRARDLC 3.600.000 MT 260.00 300.000 MT X 12 TRARDLC PAYMENT IN ARDLC, Transferable, Irrevocable, Divisible. $10.00 less for using a BG or SLC (2 MONTH) for part payment. PAYMENT NON TRANSFERABLE MORE USD 5,00 DESTINATION & DELIVERY Destination: CIF ASWP. Shipment: in 30-45 Days and Rest in Every 30 Days after Receipt of Payment Instrument to the Seller’s Bank. PACKING 50 kg Branded bags packed 1/ 1.5/ 2 MT in bulk in Jumbo sling bags IMPORTANT DETAILS Performance Bond cannot be more than 2% Inspection by SGS at loading port PROCEDURES 1) Buyer issues a LOI or ICPO + RWA + NCND 2) Seller issues FCO 3) Buyer sign, seal and return the FCO 4) Seller issues Draft Contract 5) Buyer sign, seal and return the Contract, seller sign the Contract and return to the Buyer 6) Buyer and Seller deposit a copy of the executed Contract to their respective Banks. 7) Within 3 (three) banking days, Buyer Bank sends a Non-operative ARDLC to the seller’s Bank 8) Within 48 hours Seller's Bank sends Proof of Products (POP) + PB 2% via Swift Bank to Bank methods to the Buyer’s Bank 9) ARDLC operative. 10) Shipment. http://igorka1975.narod.ru/business.html